TID Set to Start Running Again 6/28

IRRIGATION WATER START UP (POSTED JUNE 24, 2021) TID Website

The district will start refilling the canals on Monday, June 28th. As always, the canals need to be brought up to operating depths slowly as not to cause any canal failures. This process will take several days.

If you are located on a pressure line, please do not open any valves without first talking to your ditch rider. If people start irrigating before the pressure line is charged, it takes a much longer period of time to get the lines completely charged and ready for use.

Emigrant Lake – 24% full

Howard Prairie – 6% full

Hyatt – 14% full

//inserted by Sharon